Projects
LUKOIL Neftohim Burgas - Heavy Residue Processing Complex
LUKOIL Neftohim Burgas - Heavy Residue Processing Complex
EMPLOYER: LUKOIL Neftohim Burgas
MAIN CONTRACTOR: Technip Italy Spa
SCOPE OF WORKS: Electrical and Instrumentation Works
ELECTRICAL WORKS:
Cabling
Grounding system
Lightning
Commissioning
INSTRUMENTATION WORKS:
Cabling
Installation of instruments
Commissioning
Saint Nikola Wind Farm - Kavarna, Bulgaria
Saint Nikola Wind Farm - Kavarna, Bulgaria
EMPLOYER: AES Geo Energy
MAIN CONTRACTOR: ELTE Engineering EOOD
SCOPE OF WORK: Civil and Electrical works
INFORMATION:
ELTE Engineering was the main contractor for the Saint Nikola Wind Farm project, which is the
biggest wind farm in Bulgaria (an investment of AES Geo Energy). It is located in Kavarna and consists of 52 turbines with 3MW power output each, 45km. of roads, 65km. of cable trenches, 198km. 33kV power cables, and 65 optical cables.
ELTE Engineering completed the main works on this project saving 25% of the total time allocated for construction (dedicated 8 months, completed in 6) due to strict planning, effective organization, practical and fast solutions on site.
The expertise and experience ELTE Engineering has gathered during the completion of that project has enabled the company to easily foresee difficulties, assess risk and makes ELTE a great partner in the construction of any other such projects.
Residential Complex Aykoris – Stara Zagora, Bulgaria
Residential Complex Aykoris – Stara Zagora, Bulgaria
INVESTOR AND MAIN CONTRACTOR: ELTE Engineering EOOD
TOTAL FLOOR AREA: 6 215.00m2
Residential complex Aykoris is situated in Jeleznik - the fast developing zone in the west part of Stara Zagora.
Complex is situated in an very communicative position beside the Stara Zagora–Plovdiv main road. In close proximity there are Technomarket and Praktiker hypermarkets.
Waste Water Treatment Plant – Stara Zagora, Bulgaria
Waste Water Treatment Plant – Stara Zagora, Bulgaria
EMPLOYER: Ministry of Regional Development and Public Works
MAIN CONTRACTOR: HEITKAMP-MASS Consortium
SCOPE OF WORK: Electrical and installation works as well as part of the construction works
Electrical and installation works:
Substation
MCC Panels
Cabling
Lighting
Automation and SCADA system
Lightning system
Fire alarm system
Intruder alarm system
Grounding system
Waste Water Treatment Plant – Dimitrovgrad, Bulgaria
Waste Water Treatment Plant – Dimitrovgrad, Bulgaria
EMPLOYER: Ministry of Regional Development and Public Works
MAIN CONTRACTOR: HEITKAMP-MASS Consortium
SCOPE OF WORK: Electrical and installation works as well as part of the construction works
Electrical and installation works:
Substation
MCC Panels
Cabling
Lighting
Automation and SCADA system
Lightning system
Fire alarm system
Intruder alarm system
Grounding system
Maritza East I Power Plant – Galabovo, Stara Zagora, Bulgaria
Maritza East I Power Plant – Galabovo, Stara Zagora, Bulgaria
EMPLOYER: AES
MAIN CONTRACTOR: TGO
SCOPE OF WORK: Design, electrical and installation works
Design:
Temporary power delivery and installation
Water and sewage systems
Fire alarm system
Office buildings
Electrical and installation works:
Substation 20/0.4kV
2x1600kVA transformers
2x1125kVA diesel generator systems
Temporary electrical systems:
Underground power cables 0.4kV
Grounding system
Lighting
Lightning system
Fire alarm system
Construction works:
Temporary office buildings for the completion of Maritza East I Power Plant.